Equipment

Our Equipment

Specialized HWO and Snubbing equipment for demanding well operations onshore and offshore.

Our equipment

HWO / Snubbing Units

For HWO and Snubbing solutions, we work with selected specialist partners, including BPC, whom we represent. BPC specializes in the development, construction and operation of advanced Hydraulic Workover (HWO) and Snubbing Units for both onshore and offshore applications.

BPC HWO/Snubbing Units provide an efficient alternative to conventional drilling and workover rigs. Their compact footprint combined with high pull force makes them particularly suitable for projects where available space, deck loading or crane capacity is limited.

The modular design allows for a wide range of configurations, enabling each unit to be adapted to specific well conditions, operational requirements and site limitations.

BPC designs and builds its own units and continuously develops its equipment with a strong focus on safety, operational efficiency and environmental performance.

As a representative of BPC, we can support clients in identifying the right HWO or Snubbing solution for their specific project and provide a direct point of contact throughout the process.

  • Compact footprint
  • High pull force
  • Modular and flexible configuration
  • Suitable for onshore and offshore operations
  • Reduced deck loading requirements
  • Suitable for locations with limited crane capacity
  • Efficient alternative to conventional workover rigs
  • Designed with a strong focus on safety and operational efficiency
01 240K Unit

240K Unit

  • Flexible
  • Mobile & Quick
  • Small Footprint
  • 240,000 lbs Max Pull
  • 120,000 lbs Max Snubbing
02 340K HWO/Snubbing Unit

340K HWO/Snubbing Unit

  • Flexible
  • Mobile & Quick
  • Small Footprint
  • Live & Dead Well Operations
  • Onshore & Offshore
  • 340,000 lbs Max Pull
03 385K Space Saver I

385K Space Saver I

  • Ideal for Offshore Projects
  • Suitable for Skid Frames
  • Small Footprint
  • Under Redevelopment
  • 385,000 lbs Max Pull
  • 170,000 lbs Max Push
04 385K Space Saver II

385K Space Saver II

  • Ideal for Offshore Projects
  • Skidding
  • Small Footprint
  • Optimized Operational Performance & Safety
  • 385,000 lbs Max Pull
  • 170,000 lbs Max Push
05 385K Space Saver III

385K Space Saver III

  • Quick & Efficient Rig-Up
  • Easy to Operate
  • Small Footprint
  • Cost-Effective Workover & P&A Operations
  • 385,000 lbs Max Pull
06 600K HWO Unit

600K HWO Unit

  • Flexible
  • Mobile
  • Small Footprint
  • Live & Dead Well Operations
  • Onshore & Offshore
  • 600,000 lbs Max Pull
  • 263,000 lbs Max Push
07 CSU 160 Unit

CSU 160 Unit

  • Easy Fit on Most Jack-Up Rigs
  • Full Integration with Rig Systems
  • Rig Assist Unit
  • Fully Remote Controlled
  • 160,000 lbs Max Pull
  • 80,000 lbs Max Push
08 Casing Jack

Casing Jack

  • Quick & Simple Rig-Up
  • Simple to Operate
  • Small Footprint
  • Up to 37.5 inch Casing Diameter
  • Compact & Cost-Effective
  • 440,000 lbs Max Pull
09 Additional Equipment

Additional Equipment

  • PCE Equipment
  • 7 1/16 inch 15K BOPs
  • 11 inch 10K BOPs
  • 13 5/8 inch 5K BOPs
  • 18 3/4 inch 15K BOPs
  • Mud Pumps, e.g. HT400
  • Casing, Tubing and Drill Pipe Tongs
  • Storage Tanks

Let’s power your next project

Connect with our team to discuss how we can support your operational requirements.

Get in touch