240K Unit
- Flexible
- Mobile & Quick
- Small Footprint
- 240,000 lbs Max Pull
- 120,000 lbs Max Snubbing
Equipment
Specialized HWO and Snubbing equipment for demanding well operations onshore and offshore.
Our equipment
For HWO and Snubbing solutions, we work with selected specialist partners, including BPC, whom we represent. BPC specializes in the development, construction and operation of advanced Hydraulic Workover (HWO) and Snubbing Units for both onshore and offshore applications.
BPC HWO/Snubbing Units provide an efficient alternative to conventional drilling and workover rigs. Their compact footprint combined with high pull force makes them particularly suitable for projects where available space, deck loading or crane capacity is limited.
The modular design allows for a wide range of configurations, enabling each unit to be adapted to specific well conditions, operational requirements and site limitations.
BPC designs and builds its own units and continuously develops its equipment with a strong focus on safety, operational efficiency and environmental performance.
As a representative of BPC, we can support clients in identifying the right HWO or Snubbing solution for their specific project and provide a direct point of contact throughout the process.
Connect with our team to discuss how we can support your operational requirements.